Marat Khusnullin: 70% of the AIP is used for the development of Moscow transport infrastructure

10.10.2017

About 70% of the funds of the Address investment program for 2018-2020 are planned to be spent on the development of the transport system in Moscow and, first of all, on the construction of the subway. This was told by the Deputy Mayor of Moscow on Urban Development Policy and Construction Marat Khusnullin.

“A significant amount of the city budget will be directed to the development of the metro network. The AIP actually provides the opportunity for the further development of the Moscow Metro until 2025. During this time, the construction of the Third interchange route, the lines Raskazovka – Petrovsky Park, Nekrasovka – Aviamotornaya, Stolbovo – Sevastopolsky Prospekt, Salarievo – Dmitrov highway, Belomorskaya station and six electric depots”, said Marat Khusnullin.

According to the head of the Construction Complex, the project of the AIP provides for the construction of a technological part of the order of 55 TPUs at metro stations that must provide comfortable transplants between stopping points of various modes of transport, and strengthen the integration of the MCC stations and the metro with the radial directions of Russian Railways.

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...