The first house included in the renovation program was demolished

23.08.2018

Works on the dismantling of the first five-story building, which was included in the renovation program has began in Moscow. Its residents have already moved to a new house next door – on the 5th Parkovaya Street, just 300 meters from the old dwelling.

The site of the “historic” demolition was visited by Moscow Mayor Sergey Sobyanin, as well as former residents of the five-story building. The mayor of Moscow told the residents about the use of the technology of “smart disassembly”, which will allow using the remaining materials for a second time. “Clever demolition” – when glass, plastic, metal, wood are disassembled and sorted separately, and then sent for processing, it will become the standard for demolition under the renovation program.

“So a part of your house will be in other houses, other construction sites, roads, structures,” Sergey Sobyanin said to the new settlers.

The mayor recalled that a year has passed since the approval of the housing renovation program. During this time, lists of buildings to be demolished were formed.

In the area of ​​Northern Izmailovo, the program includes 179 houses with a total area of ​​almost 600 thousand square meters. There are six launching grounds approved here.

Source: Construction  Complex of Moscow

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...